Vaillant heat pump in front of a brick wall

[ Huber Heiztechnik ]

Heat pumpfrom one source

You heat without oil and gas, and the state makes a generous contribution to the switch. To make sure the system also runs economically in winter, it is designed precisely for your house. Huber Group submits the KfW 458 funding application together with you and remains your contact for maintenance and service after installation.

+49 151 74568876
Over 100 heat pumps installed in the region. Up to 80 % funding possible, as of the BEG reform of 21 July 2026.
4.942 Google reviews
  • Over 1,500 satisfied customersin the region
  • Master craftsman businessKassel Chamber of Skilled Crafts
  • Loxone Gold Partner
  • Loxone Master of Automation
  • Loxone industry winner Smart Home, 100 points
  • Vaillant specialist partner
  • AlphaESS Installation Partner
  • Bundesverband Wärmepumpe (German Heat Pump Association)
  • Heat pump specialist business, Bundesverband Wärmepumpe (German Heat Pump Association)
  • 30 years of E-CHECK. Only from your guild-member business
  • Premium E-Markenbetrieb (quality label of the German electrical trades)
  • Ajax, authorised installation company
  • E-Handwerk: qualified guild-member specialist business
  • Homematic IP

Heat pumps from our projects

Over 100 heat pumps installed, outside on a solid base, inside with neatly insulated pipes.

  • Air-to-water heat pump on a concrete slab in a gravel bed at the corner of the house, with lawn and hedge behind it
  • Heat pump with two fans in front of a house
  • Large air-to-water heat pump next to the front entrance
  • Heat pump indoor unit with new copper pipes under the basement ceiling
  • Indoor unit and hot water cylinder in a utility room next to the washing machine and tumble dryer

Photos from our projects, light and colours retouched with AI.

View all projects
[ Why now ]

Switching pays off now

If you replace your old oil or gas heating now, you receive up to 80 % of the eligible costs as a grant through KfW 458.

If you wait, you get less: from 1 February 2027, the climate speed bonus falls by 4 percentage points every six months and ends completely in August 2028. The maximum eligible costs also fall by €750 every six months from February 2027.

  • Over 100 heat pumps

    Planned, installed and commissioned in Bad Hersfeld and the region.

  • Funding application included

    We take care of the KfW 458 application and all the supporting documents. You do not have to work your way through the forms.

  • Vaillant partner

    We install tested brand-name units from Vaillant, with a manufacturer’s warranty of up to 10 years.

  • Even cheaper with PV

    With your own PV system, a good share of your heating runs on power from your own roof. We plan both together.

[ Funding ]

How your funding is made up

30 %Basic funding
For replacing the heating system in an existing building.
16 %Climate speed bonus
If you live in the house yourself and replace an old fossil-fuel heating system. Falls by 4 percentage points every six months from 1 February 2027 and ends in August 2028.
40, 30 or 10 %Income bonus
For a taxable household income of up to €30,000, €40,000 or €50,000.
70 to 80 %Cap
Usually 70 % of the eligible costs, 80 % for a household income of up to €30,000 (up to €40,000 with a child).
€22,400Maximum grant
For the first residential unit, €28,000 is eligible. This limit falls by €750 every six months from February 2027.

Example calculation

Cost of the heat pump~€30,000
Eligible costs (KfW 458)€28,000
Basic funding 30 % and climate speed bonus 16 %−€12,880
Your investment~€17,120
Heating costs you save each year~€1,800
Payback period≈ 9 years

Example for a household without the income bonus, as of 21 July 2026. With the income bonus, the grant rises considerably. Actual figures depend on the building, the funding rate and consumption.

Calculate your funding yourself

In just a few minutes, you can see how much grant you are entitled to.

The Heizreport calculator is in German.

Funding calculator by Heizreport

Loading the calculator establishes a connection to heizreport.de and transfers data.

This click only allows this service. More in the privacy policy.

[ Which one fits ]

Two routes to a heat pump

We advise you honestly on which system is the better choice for your house.

Air-to-water heat pump installed by Huber Group on concrete bases in front of a natural stone wall

Air-to-water heat pump

It uses the heat in the outside air and is the most common heat pump in detached houses: no ground works, quick to install and eligible for funding.

  • No ground works needed
  • Usually installed in one to two days
  • Works efficiently down to −20 °C
  • Can also cool in summer
PVT panel and heat pump from Triple Solar

PVT system from Triple Solar

PVT panels on the roof generate electricity and at the same time supply the heat for the heat pump in the house. Electricity and heat thus come from the same roof area.

  • Electricity and heat from one system
  • Mounted on the roof, no ground works
  • No outdoor unit in the garden
  • Ideal if PV is planned anyway

Why a heat pump is so economical

The heat pump draws most of its heat from the surroundings and only needs electricity to drive it. The ratio is called the coefficient of performance, or COP. A COP of 4 means that one kilowatt hour of electricity becomes four kilowatt hours of heat.

1 kWhof electricity in

4 kWhof heat out, at COP 4

Homematic IP

Every room warms up evenly, without modifying the valves

No radiator stays lukewarm, and your heat pump runs more economically. The hydraulic balancing required for funding runs automatically and keeps adjusting itself. This is made possible by Homematic IP radiator thermostats, installed by Huber Group as a system integrator. TÜV Rheinland has certified the method as equivalent to method B under the BAFA and KfW checklist.

Certificate for radiator thermostats with control algorithm 2.0, valid until 17 September 2027. It does not replace the review of your funding application. Announcement from Homematic IP

Your new heat pump in four steps

  1. Free consultation

    We look at your house and your radiators and calculate the heating load. Without obligation.

  2. Funding application and planning

    We submit the KfW 458 application and plan the system to suit your house.

  3. Installation

    Our team installs the heat pump and puts it into operation, usually in one to three days.

  4. Maintenance and service

    Regular maintenance safeguards efficiency and the warranty. If there is a fault, we are with you within 24 hours.

  5. Your heat pump is running.

Questions about heat pumps

Your heat pump from a master craftsman business

Free consultation without obligation. We check your house, your radiators and the funding you are entitled to.

+49 151 74568876
Huber Group consultant showing a customer a Loxone Miniserver during a consultation
Huber Group technician documenting the boiler room on a tablet during the site visit